Former Hotel, Newquay

South West Geotechnical Ltd was instructed to undertake a Phase 1 coastal stability assessment to assist with a planning application for the proposed redevelopment of a former Hotel located on the cliff top in Newquay

Continue Reading

Coastal Stability Assessment

South West Geotechnical Ltd undertook a Phase 1 stability assessment to assist with a planning application for the proposed redevelopment of a property off of, Southtown, Dartmouth, Devon

Continue Reading

Shotwick Solar Park

South West Geotechnical was commissioned to complete a ground investigation and geotechnical assessment for a large 74MW ground mount solar park

Continue Reading

New Link Road

South West Geotechnical Ltd, acting on behalf of the local Authority undertook a geotechnical investigation to assist with a new link road to the north of Newton Abbot

Continue Reading

Torhill, Marldon

SWG were instructed to scope and complete a comprehensive geo-environmental and geotechnical assessment for the redevelopment of a former limestone quarry and cement works at Torhill, Marldon, Devon

Continue Reading

WPD Depot, Exeter

SWG were instructed to scope and complete a comprehensive geo-environmental and geotechnical assessment for the redevelopment of the WPD depot, Exeter, Devon

Continue Reading

Flood Relief

SWG were instructed to scope and complete a comprehensive geotechnical assessment for a series of proposed flood relief dams in Modbury, Devon

Continue Reading

Newlands Marina

SWG were instructed by Land And Water Services to complete a geotechnical assessment to help with the design of a new canal-side marina in Milton Keynes

Continue Reading

Carclaze and Baal Technology Park

The development site at West Carclaze formed a part of the wider mining landscape within the St Austell China Clay Area and features of the site had been formed through the extensive mining operations undertaken over many years

Continue Reading

Solar Park Developments

Our involvement in this sector stemmed from the first 'feed-in tariff' wave of developments and our existing relationships with leading renewables firms that were diversifying from wind to solar

Continue Reading

Peat Permeability

It was proposed to exploit a new peat working close to an existing isolated house on the Somerset Levels. Due to concerns of the impact of groundwater drawdown due to the workings on the house foundations, it was necessary to model what would occur in this process

Continue Reading

New Housing Development

A new housing development was proposed on a former heavy industrial site in Frome, Somerset. Before development could proceed, the site needed to be levelled by importing soil to upfill low areas by as much as 7 metres, and a 6m high reinforced fill slope built to bound the adjacent River Frome

Continue Reading